Service
Interconnection & PTO
Utility interconnection filed and tracked through Permission to Operate.
The system is installed, the customer is asking when it turns on, and the utility hasn't responded in three weeks.
Best for: Contractors whose permitting is handled but whose PTO timelines keep slipping.
Scope
Exactly where the work starts and stops
Municipal permit fees and utility filing fees are always paid by you, directly. We never mark them up.
What is included
- Prepare and submit the utility application
- Respond to utility engineering review
- Confirm the final approval and deliver it to the client
What is not
- Drawing the plan set — you supply it
- Filing the permit with the building department — you file it
- Government, utility, and PE stamp fees — billed at cost, never marked up
- On-site work: physical installation, site survey, or attending inspections
Process
What we actually do
These are the steps tracked on the project itself. You see the same list, with the current one highlighted, in the portal.
- 1
Prepare and submit the utility application
- 2
Respond to utility engineering review
- 3
Confirm the final approval and deliver it to the client
Intake
What we need from you to start
Send these and the job can begin. Anything missing, we chase once and note it on the project rather than stalling silently.
- Site address
- System size (kW)
- Battery make and model
- Total inverter output (kW AC)
- Utility AC disconnect
- Electric utility
- Utility account number
- Meter number
- Account holder, exactly as printed
- Anything already generating here
- Approved permit number
- Inverter make and model
Other services
Need more, or less?
Plan Sets
AHJ-ready plan sets and load calculations, built for your jurisdiction.
Permit Filing
Your plan set filed with the building department and chased to approval.
Plans to PTO
One handoff: engineering, AHJ permitting, and utility PTO end to end.
Electrical Service Upgrade
Main panel upgrade drawings, permit, and the utility service application.
Ready to hand off Interconnection & PTO?
Tell us the site address, the AHJ, and the equipment. We will confirm scope and price before anything starts.