Service
Plan Sets
AHJ-ready plan sets and load calculations, built for your jurisdiction.
Your crew is ready but the plan set isn't, and the last one came back with corrections that cost you two weeks.
Best for: Contractors who file their own permits and only need the engineering done right the first time.
Scope
Exactly where the work starts and stops
Municipal permit fees and utility filing fees are always paid by you, directly. We never mark them up.
What is included
- Review site notes, photos, and equipment against the scope
- Draft plan set and run load calculations
- QC the returned set against AHJ requirements
- Deliver the permit-ready plan set
What is not
- Filing the permit with the building department — you file it
- The utility interconnection application and PTO
- Government, utility, and PE stamp fees — billed at cost, never marked up
- On-site work: physical installation, site survey, or attending inspections
Process
What we actually do
These are the steps tracked on the project itself. You see the same list, with the current one highlighted, in the portal.
- 1
Review site notes, photos, and equipment against the scope
- 2
Draft plan set and run load calculations
- 3
QC the returned set against AHJ requirements
- 4
Deliver the permit-ready plan set
Intake
What we need from you to start
Send these and the job can begin. Anything missing, we chase once and note it on the project rather than stalling silently.
- Site address
- System size (kW)
- Module make and model
- Inverter make and model
- Battery make and model
- Building department (AHJ)
- Service voltage
- Existing busbar rating (amps)
- Existing main breaker rating (amps)
- Service entrance
- How it ties in
- Total inverter output (kW AC)
- Rapid shutdown
- Roof covering
- Utility AC disconnect
Other services
Need more, or less?
Permit Filing
Your plan set filed with the building department and chased to approval.
Interconnection & PTO
Utility interconnection filed and tracked through Permission to Operate.
Plans to PTO
One handoff: engineering, AHJ permitting, and utility PTO end to end.
Electrical Service Upgrade
Main panel upgrade drawings, permit, and the utility service application.
Ready to hand off Plan Sets?
Tell us the site address, the AHJ, and the equipment. We will confirm scope and price before anything starts.