Plans to PTO
One handoff: engineering, AHJ permitting, and utility PTO end to end.
You are running permitting and interconnection between installs, and jobs stall because nobody owns the next step.
Best for: Contractors who want a single back office for everything between the signed contract and the meter spinning.
Scope
Exactly where the work starts and stops
Municipal permit fees and utility filing fees are always paid by you, directly. We never mark them up.
What is included
- Review site notes, photos, and equipment against the scope
- Draft plan set and run load calculations
- QC the returned set against AHJ requirements
- Deliver the permit-ready plan set
- Assemble and submit the permit application to the AHJ
- Track plan check and answer jurisdiction comments
- Record the approved permit number and issue date
- Prepare and submit the utility application
- Respond to utility engineering review
- Confirm the final approval and deliver it to the client
What is not
- Government, utility, and PE stamp fees — billed at cost, never marked up
- On-site work: physical installation, site survey, or attending inspections
Process
What we actually do
These are the steps tracked on the project itself. You see the same list, with the current one highlighted, in the portal.
- 1
Review site notes, photos, and equipment against the scope
- 2
Draft plan set and run load calculations
- 3
QC the returned set against AHJ requirements
- 4
Deliver the permit-ready plan set
- 5
Assemble and submit the permit application to the AHJ
- 6
Track plan check and answer jurisdiction comments
- 7
Record the approved permit number and issue date
- 8
Prepare and submit the utility application
- 9
Respond to utility engineering review
- 10
Confirm the final approval and deliver it to the client
Intake
What we need from you to start
Send these and the job can begin. Anything missing, we chase once and note it on the project rather than stalling silently.
- Site address
- System size (kW)
- Module make and model
- Inverter make and model
- Battery make and model
- Building department (AHJ)
- Service voltage
- Existing busbar rating (amps)
- Existing main breaker rating (amps)
- Service entrance
- How it ties in
- Total inverter output (kW AC)
- Rapid shutdown
- Roof covering
- Utility AC disconnect
- Property owner of record
- Electric utility
- Utility account number
- Meter number
- Account holder, exactly as printed
- Anything already generating here
Other services
Need more, or less?
Plan Sets
AHJ-ready plan sets and load calculations, built for your jurisdiction.
Permit Filing
Your plan set filed with the building department and chased to approval.
Interconnection & PTO
Utility interconnection filed and tracked through Permission to Operate.
Electrical Service Upgrade
Main panel upgrade drawings, permit, and the utility service application.
Ready to hand off Plans to PTO?
Tell us the site address, the AHJ, and the equipment. We will confirm scope and price before anything starts.